Blog‎ > ‎

August 11th, 2009

posted Aug 11, 2009, 7:15 AM by 1897 House   [ updated Aug 12, 2009, 2:04 PM ]
Started off the day trying to decide how much lighting to put into the first floor bathroom only to realize the dimensions of the room make accessing the corner sink completely impossible.  After a brief huddle with the supervisor, plumbers and electricians, we have decided to lose the small closet and move the bathroom doorway out about fifteen inches.  We'll need to adjust the location of the claw foot tub and toilet as well as move the new window into the bathroom (which is actually a good thing).  Heading to Home Depot to buy the architect a @#!$% tape measure!

Accomplishments for the day included advancements on the hot water heating on the second floor, the start of siding removal and more wiring in the kitchen. The boiler arrived today though they sent the wrong size hot water tank (as a sidearm to the boiler).  The HVAC subs finished running the duct work and vents to the upstairs bedrooms.  Quite a lot of dust still lingering.
Comments