Blog‎ > ‎

August 21st, 2009

posted Aug 21, 2009, 2:35 PM by 1897 House   [ updated Aug 21, 2009, 2:48 PM ]
End of week five.  

Electrician ran the new heavy duty inside wire for the soon-to-be-buried service as well as running new wire to the dining and living room outlets (including a wall switch in the living room which controls a switched outlet).

Plumbers continued their assault on the boiler with installation of the electronic controls and gas line in addition to running the gas line to the new stove.
Comments