Construction: New back door frame with temporary door installed as well as new window in the first floor bathroom and new rail along the steps to the basement.

Electricians worked on the third bedroom on the second floor as well as installing a new sconce in the stairway.  The trench for the underground electrical lateral was dug with the new line being installed on Wednesday or Thursday.  We will hopefully have it inspected by Friday so it can be covered for the weekend.

Tomorrow, the insulation subs will be here to spray foam on the exterior walls and put up interior insulation in various locations.  Drywall is still set to begin next week.